Halton County Bridges
https://heritagecollections.elgin.ca/link/archives177590
- Museum / Archive
- Elgin County Archives
- Part Of
- County of Elgin fonds
- Description Level
- File
- GMD
- textual records
- technical drawings
- Date Range
- 1918-1919
- Accession Number
- 2015-55
- Storage Location
- M1 S1 Sh2 B2 F16
- Museum / Archive
- Elgin County Archives
- Part Of
- County of Elgin fonds
- Description Level
- File
- Accession Number
- 2015-55
- Storage Room
- Archives 4th Floor Storage Room
- Storage Location
- M1 S1 Sh2 B2 F16
- GMD
- textual records
- technical drawings
- Date Range
- 1918-1919
- Physical Description
- 1 cm of textual records
- Scope and Content
- -Technical drawing: "Tansley Bridge: Revised East Abutment, July 10, 1918".
- -Technical drawing: "Concrete Deck & Railway for Tansley Bridge over Twelve Mile Creek on Dundas Street, Nelson Township for the County of Halton, February 26, 1919.
- -Specification for the Construction of Reinforced Concrete Abutments, Piers, Bridge, Bridge, Floor and Railing, for a Bridge to be erected on Dundas Street in the Township of Trafalgar in the County of Halton, James A. Bell & Son, Civil Engineers, December 19, 1919 (3 copies).
- Subject Access
- Bridges
{{ server.message }}
{{ server.message }}
{{ book.title }}
{{ book.callNumber }}