Aylmer Public Utilities Commission - Work in Full Swing
https://heritagecollections.elgin.ca/link/archives54421
- Museum / Archive
- Elgin County Archives
- Part Of
- St. Thomas Times-Journal fonds
- Description Level
- Item
- GMD
- graphic material
- Date Range
- 1969
- Accession Number
- 2008-01
- Storage Location
- C9 Sh3 B3 F52 4
- Museum / Archive
- Elgin County Archives
- Part Of
- St. Thomas Times-Journal fonds
- Creator
- St. Thomas Times-Journal
- Description Level
- Item
- Accession Number
- 2008-01
- Storage Room
- Archives Storage Rm. 105
- Storage Location
- C9 Sh3 B3 F52 4
- GMD
- graphic material
- Date Range
- 1969
- Physical Description
- 1 photograph : b&w ; 13 x 18.5 cm
- Scope and Content
- Black and white photograph used in St. Thomas Times-Journal article published August 29, 1969 with caption: "In Full Swing - Work on a sanitary end storm sewer by Haggerty and Campbell Construction Company of Ingersoll is in full swing. After four days of excavation, the trench for the Elk Street sanitary sewer already stretches halfway to John Street. Work on the sewer, stretching from Victoria to John Street is expected to be completed in 45 days. Cost to the municipality is estimated at $87,439.50."
- Name Access
- St. Thomas (Ont.)
- St. Thomas Times-Journal
- Aylmer Public Utilities Commission
- Aylmer (Ont.)
- Subject Access
- Newspapers
- Utilities
Images
{{ server.message }}
{{ server.message }}
{{ book.title }}
{{ book.callNumber }}