Skip header and navigation
Stalter Gully Bridge Under Construction
- Museum / Archive
- Elgin County Archives
- Part Of
- Wilfred Smith fonds
- Description Level
- Item
- GMD
- graphic material
- Date Range
- ca. 1922
- Accession Number
- 2014-2
- Storage Location
- C1 Sh2 B4 F31
- Museum / Archive
- Elgin County Archives
- Part Of
- Wilfred Smith fonds
- Creator
- St. Thomas Times-Journal
- Description Level
- Item
- Accession Number
- 2014-2
- Storage Room
- Archives Storage Rm. 105
- Storage Location
- C1 Sh2 B4 F31
- GMD
- graphic material
- Date Range
- ca. 1922
- Publication
- Published in the Aylmer Express: February 26, 2014.
- Posted on Facebook: June 10, 2019.
- Physical Description
- 1 photograph : b&w ; 20.5 x 25 cm
- Scope and Content
- Black and white photograph showing the Stalter Gully Bridge, County Road 42 (Nova Scotia Line), lots 27 and 28, concessions 1 and 2, Township of Malahide, under construction, ca. 1922. The bridge was demolished and replaced in 1966.
- Name Access
- Malahide (Ont. : Township)
- Subject Access
- Bridges
Less detail